Tolko to halt its Lakeview sawmill for 2 weeks in BC

Tolko to halt its Lakeview sawmill for 2 weeks in BC

Posted on May 22, 2023   |  

The company declared 2-weeks of unscheduled rest at its Lakeview sawmill operation in BC as higher log prices and a shortage of economic fiber disabled Tolko to run at a higher capacity.

The last day of production will be on May 19th and the operations will resume on Monday, June 5th. 

The sawmill’s operations shutdown will remove 10 million board feet of lumber production and 50 employees will be affected by the temporary shutdown.



Help us by filling out this quick price survey

A PHP Error was encountered

Severity: Warning

Message: Trying to access array offset on value of type null

Filename: layouts/market_data_layout.php

Line Number: 124

Backtrace:

File: /var/www/html/application/views/layouts/market_data_layout.php
Line: 124
Function: _error_handler

File: /var/www/html/application/hooks/secDisplay.php
Line: 50
Function: view

File: /var/www/html/index.php
Line: 332
Function: require_once

A PHP Error was encountered

Severity: 8192

Message: trim(): Passing null to parameter #1 ($string) of type string is deprecated

Filename: layouts/market_data_layout.php

Line Number: 124

Backtrace:

File: /var/www/html/application/views/layouts/market_data_layout.php
Line: 124
Function: trim

File: /var/www/html/application/hooks/secDisplay.php
Line: 50
Function: view

File: /var/www/html/index.php
Line: 332
Function: require_once

https://www.timber.exchange/global-timber-pricing-survey?u=85698fe172d774aa9f2741bea744378212b2084bf6bcf91f5e485e67727a682a0de12f055594a6af65a54bdf812f1560de1f18cfb1c741fd78478bf9f2e55e68ExsnHtmAMTJd4yD%2ByLvbm1HmViCMCTgnKdvM8e%2BN5ME%3D" class="survey-banner-link" id="bannerLink" target="_blank"> Take Survey